|  
					  JANUARY 2011  
					  
						- 01/15/11 Cleaned old undercoating from under rear seat
						  and painted with POR-15 
  
						- 01/22/11 Installed new top hydraulics, hoses and new
						  motor
  
						- 01/23/11 Installed new wiring harness to the top
						  motor
  
						- 01/29/11 Cleaned old undercoating from trunk and painted
						  with POR-15 
  
					   
					    
					    
					 FEBRUARY 2011  
					  
						- 02/05/11 Painted hinge, gas tube and trunk lip
						  yellow
  
						- 02/06/11 Installed new wiring harness to the rear of
						  vehicle
  
						- 02/06/11 Replaced trunk side floors with new
						  material
  
						- 02/06/11 Installed new carpet in floor
  
						- Installed back up switch and lights
  
					   
					    
					   3/5/11 Installation of audio tech
						hidden radio that will be under the seat. The floor has been cleaned and
						painted with POR15 paint  
					   3/10/11 Seat springs have been
						repaired, bead blasted and painted satin black.  
					   Seats are now ready for their new foam
						and upholstery.  
					 I ordered the new upholstery from SMS Auto Fabrics in Oregon
						and finally picked them up on May 29.  Cool Customs is doing the seats
						(white with black inserts).  
					 MAY 2011  
					  
						- 5/17/11 Car into shop for glass repairs and new liners
						  that the glass slides in (ISSUES)
  
						- 5/27/11 Ordered new convertible top in pinpoint white,
						  pads, well and tack strips
  
						- 5/28/11 Replaced 3 canvas covered aging wires in the
						  engine compartment bundle
  
						- 5/28/11 Installed new headlights
  
						- 5/28/11 Worked on convertible top window seals and tapped
						  holes for machine screws
  
						- 5/29/11 Installed new starter solenoid
  
						- 5/29/11 Installed wing windows after Odgen Chrome
						  re-chromed them
  
						- 5/29/11 Jute padding in the trunk and topped off
						  convertible hydraulic system
  
						- 5/30/11 Hooked up oil pressure gauge
  
						- 5/30/11 Repaired windshield wiper motor and have it
						  working now.
  
						- 5/30/11 Reinstalled the dash AM radio and wired the
						  lights to come on when the headlights are on.
  
					   
					 JUNE 2011  
					 6/2/11 New upholstery installed, trunk carpet trimmed out.
						Spare tire cover and new top boot in white. SMS Auto Fabrics in Oregon did the
						door panels and arm rests in the rear and Cool Customs in Yuba City did the
						seats. I was not thrilled with SMS Auto Fabrics, it took 8 months to get the
						door panels and you pay top dollar. I purchased the seat material and seat
						inserts from SMS also to get original materials.  
					    
					    
					    
					    
					    
					    
					    
					    
					  
						- 6/4/11 Lincoln Car show was rained out 
  
						- 6/5/11 All MoPar car show in Fremont at Olone College was
						  cool but there was a 60% chance of rain and I didn't bring the car.
  
						- 6/18/11 Local car show in Yuba City
  
						- 6/22/11 New convertible top, pads, tack strips and well
						  arrived.
  
					   
					    
					 JULY 2011  
					  
						- 7/10/11 Took second place in stock cars 1955 to 1959 at
						  Truckee Car show Cannibal Cruise
  
						- 7/18/11 New pinpoint white convertible top installed by
						  Cool Customs in Yuba City.
  
						- 7/30/11 Installed Monroe rear Air Shocks, new engine
						  thermostat, and started work on the steering wheel.
  
					   
					 AUGUST 2011  
					    
					  
						- 8/2/11 Steering wheel has been restored using epoxy putty
						  from POR-15 and SEM plastic paints Landu Black and Clear Coat low luster
						  finish. Filled cracks with epoxy putty and sanded with 320 then 400 sandpaper
						  for a smooth finish. Came out nice!
  
						- 8/3/11 Horn Ring was chromed and painted Gold then
						  installed today.
  
						- Getting ready for Hot August Nights in Reno finishing up
						  little details.
  
						- 8/8/11 HOT AUGUST NIGHTS
  
					   
					 2012 CLICK LINK BELOW  
					 <<< BACK TO 2010 MAINTENANCE PAGE
						| Forward to 2012 Maintenaance Logs
						>>>   |